1/4/2024 0 Comments Overpass road![]() Odessa district engineer Eric Lykins, P.E., thanked the Permian Basin MPO policy board’s leadership on the project. “When complete, this interchange will improve traffic flow along SH 191 at both FM 1788 and Faudree Road in a growing residential/retail area of Odessa.” “This interchange will provide an important connection to Yukon Road both north and south,” Permian Basin MPO executive director Cameron Walker said. ![]() ![]() More on these projects can be found online. Meanwhile, Midland County is building an extension of Yukon Road on the south side to connect Highway 191 to FM 1788. In conjunction with this TxDOT project, the city of Odessa is overseeing a project by Parks Bell Ranch to connect Yukon Road to Highway 191 on the north side. The Permian Basin Metropolitan Planning Organization contributed $13.12 million to this $27.5 million project, making it an MPO priority. That traffic switch is scheduled to take place in early 2023. The main lane traffic and service road traffic will be separated by a concrete barrier. The most important traffic pattern change will be moving traffic from the main lanes to the frontage roads so the overpass itself can be built. The 30-month project will have several phases that will include traffic pattern changes. MIDLAND COUNTY – A project to build an overpass to take Highway 191 over the planned extension of Yukon Road in western Midland County between Odessa and Midland is scheduled to begin the week of June 6, 2022.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |